1.Operating Time
May 19th , 2021 - Jan. 10th , 2022
2.Operating Location
Area within following four points:
19°12.005′N/110°36.379′E;
19°12.055′N/110°36.516′E;
19°11.904′N/110°36.583′E;
19°11.853′N/110°36.441′E。
3.Operation
Construction of trestle, quay, Desilting
4.Notes
1)Passing boats shall be keep shape lookout for safety.
2)No further notice when the operating ends.